FERNWOOD COMMERCIAL PARK - BUILDING #3: Estimated delivery on December 2024. The proposed BUILDING #3 at the FERNWOOD COMMERCIAL PARK. This building, like the first two buildings, will be comprised of (8) individual Commercial Condominium Units of 2,100 each. Unlike the first two buildings that were built in block, this building will be built in steel as its main structure. The passage doors, overhead doors, windows, awnings, gutters, offices, floors, hvac, insulation and exterior trim and stucco facade will mirrir the first two buildings. The actual drawings/blueprints will not be finalized and completed until at least 50% of the building pre-sold. The actual construction should only take approximately 6-7 months once started. All approvals, utilities, and site work are in place. The current prints from buildings #1 and #2 show the actual building sizes, layouts, etc. and are available for Agents to obtain in the Associated Documents.
563378
Warehouse, 1 Story
Atlantic
2024
Public Water
1
Aluminum Siding
Public Sewer
Interior Features
- Heating
- Gas Heat. .
Exterior / Lot Features
- Exterior
- Aluminum
Loading...